| 2017 | 
			2018 | 
			
			 TANAP TRANS ANATOLIAN NATURAL GAS PIPELINE PROJECT– COMPRESSOR AND METERING STATIONS/ 
			TURKEY 
			PIPING, MECHANICAL EQUIPMENT ERECTION AND TANK ERECTION WORKS 
			 | 
			
			 Within the scope of this project;  
			
				- CS5 Main, CS5 Offtake & MS2 stations pipe installation (77.259 ID + 11.221 ID = 88.480 ID)
 
				- 101 ton pipe support fabrication and installation, mechanical equipment installation (2.171 ton), storage tanks installation (3 pcs. with total weight of 72 ton)
 
				- CS1 station storage tanks installation (3 pieces with total weight of 72 ton), MS4 station storage tanks installation (2 pieces with total weight of 66 ton) were completed.
 
			 
			 | 
		
		
			| 2017 | 
			ONGOING | 
			
			 TANAP TRANS ANATOLIAN NATURAL GAS PIPELINE PROJECT–  LOT 3/ 
			TURKEY 
			BLOCK VALVE STATIONS AND PIG STATION MECHANICAL WORKS 
			 | 
			
			 Within the scope of this project, 
			
				- 7 valve stations (BVS 26 - BVS 32) and 1 pig station (PS 5) comprising of 745 ton mechanical installation and 15.096 WDI piping, 616 ton equipment installation, pipe support and installation (total weight of 50 ton) were completed. 
 
			 
			 |